Saturday, April 11, 2009

Working On Topstitching

Still waiting to hear back about my Topaz.  I'll call on Monday and see if it's been looked at.  In the meantime I've been working on topstitching my mariner's compass quilt.  The Sapphire is doing a great job.

From Quilted with Love
The only problem I'm having is drag.  Because I have to keep moving the quilt around the points, it falls behind the table.  I have it as far back as it goes, but there's enough space to hang over.  Once I get the points topstitched, I'll figure out the middle designs.

I spent part of the afternoon organizing and backing up my embroidery designs.  The last thing you want is to lose them if you computer crashes.

0 comments: